Principal Designer – Templeborough Biomass Power Plant Ltd

Key Points

  • 41 Megawatts of green electricity will be produced
  • Supplying 78k homes with energy, saving over 150k tons of CO2 a year
  • Principal Designer attendance at all design workshops and meetings
  • Ongoing monitoring and support of Principal Contractor
  • Review of management systems, procedures and physical checks
Templeborough Biomass Power Plan

Client Requirement

The Senior Partners of management company Copenhagen Infrastructure Partners (CIP) have extensive expertise within infrastructure investments, mergers and acquisitions. Templeborough Biomass Power Plant Ltd (TBPP) was set up to manage the UK interest of CIP and to act as client in the UK.

TBPP were looking for a competent organisation to undertake the Principal Designer role under CDM 2015 Regulations and to act as the CDM Advisor to both CIP and TBPP on this and other UK based projects. Our appointment to this role was from start on site of the works with no involvement prior to appointment of the EPC contractor.

Service
Principal Designer

Sector
Renewable Energy

Project
Templeborough Biomass Power Plant

Project Team
Interserve Construction Ltd
Babcock & Wilcox Vølund
Fichtner Consulting Engineers

Images Credit

Our Solution

Callidus sought to bring a competent and pragmatic design risk management approach to managing the many significant health and safety risks related to a project of this complexity.

This has included coordination of design discipline based design logs, design workshops and regular attendance at design meetings as an integral member of the project team to focus the competent design team on significant risks.

Benefits of using Callidus

Having recently developed the Principal Designer service for a major client, Callidus was able to bring relative experience to the new role created as part of the CDM 2015 regulation changes.

In addition to the Principal Designer role, Callidus also provides support in relation to the on-going monitoring of the Principal Contractor on site. Our consultants ensure the PC is effectively discharging their duties by undertaking audits and inspections of management systems, procedures, and physical checks of the project; providing guidance or support where necessary.

Callidus continues to work with client and project team to deliver a significant Power project with robust, life-cycle consideration of health and safety matters.

Templeborough Biomass Power Plan